Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1460.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Feb 23, 2022     Wing tips and pitot tube - (3 hours)       Category: Wings
Fiddled around some more with the wingtip rib location. Thinking of removing the rib flange where it interferes with the hinge and riveting a new flange to the rib to compensate for the hinge. That would give the tip the full support of the rib without removing a large portion. Also match drilled, with a drill stop to prevent damage to the pitot tube plumbing, the pitot tube mast to the pitot tube after much measuring and marking. Always stressful drilling into new high dollar parts. All went as well as could be expected. Not sure if I'm going to use 6-32 screws or 6-40. Don't really think it makes much difference.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.